KTM 250 EXC-F Six Days vs KTM 500 EXC-F Six Days Comparison
The detailed Motorcycles comparison of KTM 250 EXC-F Six Days and KTM 500 EXC-F Six Days , based on price, specifications & other features is shown below. The KTM 250 EXC-F Six Days priced at RM 55,000 while the KTM 500 EXC-F Six Days Motorcycles has a price tag of RM 59,000 . Comparing the technical specifications, KTM 500 EXC-F Six Days engine displacement is 511 while the KTM 250 EXC-F Six Days houses a 249.91 engine.
Read MoreOverview: 250 EXC-F Six Days vs 500 EXC-F Six Days
Brand | KTM Malaysia | KTM Malaysia |
Off Road Price* | RM 55,000 250 EXC-F Six Days Price | RM 59,000 500 EXC-F Six Days Price |
Variant | 250 EXC-F Six Days Standard | 500 EXC-F Six Days Standard |
User Rating | 4.42 250 EXC-F Six Days reviews | 4 500 EXC-F Six Days reviews |
Fuel Type | Petrol Petrol Motorcycles in Malaysia | Petrol Petrol Motorcycles in Malaysia |
Available Color(s) |
|
|
Vehicle Type | Off Road Off Road Motorcycles in Malaysia | Off Road Off Road Motorcycles in Malaysia |
Key Features
Start Option | Electric | Electric |
Displacement | 249.91 cc | 511 cc |
Best Loan Offers
DP RM 11,000 Installment : RM 571 x 84 Months VIEW NOVEMBER OFFERS | DP RM 11,800 Installment : RM 613 x 84 Months VIEW NOVEMBER OFFERS |
Photo Comparision
User Ratings & Review Comparison
12 reviews | 2 reviews | |
User Review Comparison |
Compare KTM 500 EXC-F Six Days With Similar Motorcycles
KTM 250 EXC-F Six Days vs KTM 500 EXC-F Six Days FAQs
Which Motorcycle is cheaper between KTM 250 EXC-F Six Days vs KTM 500 EXC-F Six Days ?
250 EXC-F Six Days is priced at RM 55,000 and 500 EXC-F Six Days is priced at RM 59,000 . Hence 250 EXC-F Six Days is the cheapest amongst these Motorcycle.
Helpful (126)Which Motorcycle has Higher ground clearance between 250 EXC-F Six Days vs 500 EXC-F Six Days ?
The 250 EXC-F Six Days comes with a ground clearance of 355 mm , on the other hand the 500 EXC-F Six Days comes with a ground clearance of 355 mm , The KTM 250 EXC-F Six Days and KTM 500 EXC-F Six Days both have same Ground Clearence.
Helpful (127)